February 15, 2014

Our drywall crews are moving their way through the apartments and as we pass inspections we have the painters following right behind.  We should be close to finishing all the drywall in the next few weeks.  Our painters have also been prepping the existing door frames as we wait to hear on a color choice from the architect.  The wood doors were delivered this past week and the metal doors are scheduled for delivery this week.

 Unit 115 existing door frame removed

 Unit 215 HP-1 wall sleeve caulked

 Unit 219 switched outlet for garbage disposal

 Unit 413 Dens-Shield installed in shower

Unit 414 sheetrock and taping

 Unit 414 kitchen painted with primer