The construction finishes are in and we have been working on punch list items and getting final inspections from the City.  The Owner has started bringing in and arranging the furnishings.  We've noted some items that will need coordination on future phases to help better tie things together.

Unit 115 accessible shower

Unit 119 backsplash being installed

Unit 313 with furniture

Unit 319 bedroom carpet and base installed

Unit 413 blinds installed

Unit 413 living room blinds

Unit 413 Owner arranged furniture

Unit 413 Owner arranged furniture

4th floor corridor aggregate paint applied

Painting outside of the concrete on the roof ledge and corridor walkways