Interior finishes are being installed throughout the units.  Pictures below detail the progress.

 Unit 113 HVAC unit installed

 Unit 213 floor tile

 Unit 215 tile installation

 Unit 414 cabinets installed flush with wall

 Unit 414 kitchen cabinets, counter top and sink installed
Third and fourth floor doors painted