November 30, 2013


Apartment 115 finished slab

Apartment 119 finished slab

Apartment 213 existing plumbing hole patched

Unit 413 shaft wall sheet rock first layer

Unit 418 bathroom window with heavy duty screen

Bathtub installed in Unit 219
Courtyard view of fourth floor windows

Framing in Apartment 114

Framing in Apartment 115

Kohler bathtub ready for install

New windows in Units 417-419

Finishing concrete plumbing patch in Unit 113

Pumping concrete to first floor units Phase 1

Monday, November 18, 2013

November 15, 2013

We're progressing really well with the plumbing and HVAC and
we started getting some windows and door installed.


West Side of Phase 1

Exterior view of Unit 416 windows

Unit 118 rebar dowels in existing floor

Unit 217 kitchen sink water supply, micro/stove outlets

Unit 218 bathroom water supply and waste

Unit 319 exhaust fan venting and refrigerant lines

CATV conduit in soffit of Unit 313

CATV conduit to pull box in Unit 313

CATV pull box and isolation valves in Unit 313

Electrical panel Unit 218

Exhaust fan duct in Unit 317

Exhaust fan duct in Unit 417

Exhaust fan in Unit 218

EF vent penetrations in existing shaft covers per RFI#2

Interior living area window installed in Unit 416

Roof penetrations for exhaust fan venting and line sets

Sliding patio door in Unit 416

Unit 216 existing plumbing hole formed and doweled

Unit 216 shower valve rough in

Unit 218 existing panel cabinet - brick removed for new conduit

Unit 417 installing kitchen window

Unit 417

Wednesday, October 16, 2013

October 15, 2013

 

Phase 1 is well under way.  We have completed and passed our underground rough in and are ready to pour back.  Currently, all of the demolition is complete in phase 1 including plumbing and electrical demolition.    We have begun rough in of the water supply for the units.  18 units (113-116, 213-216, 313-316, 413-416) have been finished framing with metal studs and furring out the walls. Electrical rough-in is complete in units 213, 214, 215 & 216.  Windows have been measured and we expect they will be installed in about 5 weeks.